Skip to content

Commit fc79b28

Browse files
committed
N-Trace 1.0.0_rc27 - Second set of ARC notes DONE.
1 parent 133df5f commit fc79b28

File tree

2 files changed

+7
-8
lines changed

2 files changed

+7
-8
lines changed

README.md

Lines changed: 7 additions & 8 deletions
Original file line numberDiff line numberDiff line change
@@ -2,24 +2,23 @@
22

33
## Status of each PDF
44

5-
**2024/05/01 status:**
5+
**2024/05/02 status:**
66

7-
* **N-Trace PDF**: Version 1.0.0_rc26 ('itype' unification DONE). Inside of [./pdfs](./pdfs) directory.
8-
* Clarification of SYNC generation is still TODO.
7+
* **N-Trace PDF**: Version 1.0.0_rc27. All known ARC notes DONE. Inside of [./pdfs](./pdfs) directory.
8+
* All known ARC notes DONE (ready for Frozen state).
99
* **Controls PDF**: Version 1.0.0_rc22. All known ARC notes DONE. Inside of [./pdfs](./pdfs) directory.
10-
* All known ARC notes DONE (ready for Freeze state).
10+
* All known ARC notes DONE (ready for Frozen state).
1111
* **Connectors PDF**: Version 1.0.0_rc30. Frozen. Inside of [./pdfs](./pdfs) directory.
1212
* It was accepted by ARC (via email).
1313

14-
**TODO (before official Freeze):**
14+
## TODO (before official freeze)
1515

1616
* TODO: Find a way to add nice header/footer at each page (Debug PDF has these).
1717
* TODO: Fix annoying page breaks (manual insert of 'page-break').
18-
* TODO: Make release with all PDFs.
19-
* TODO: Make release with all documents 'Frozen' and pass back to ARC for official OK-stamp.
18+
* TODO: Make release with all PDFs 'Frozen', same date/version and pass back to ARC for official OK-stamp.
2019
* TODO: Make Public Review announcement (all PDFs Frozen).
2120

22-
**TODO (after ratification approval):**
21+
## TODO (after ratification approval)
2322

2423
* TODO: Change status to Ratified.
2524
* TODO: Change date.

pdfs/RISC-V-N-Trace.pdf

-126 Bytes
Binary file not shown.

0 commit comments

Comments
 (0)