Skip to content

Unit test smoke test #200

Unit test smoke test

Unit test smoke test #200

Triggered via schedule October 25, 2025 06:47
Status Failure
Total duration 1m 38s
Artifacts

smoke-test.yml

on: schedule
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

8 errors
build (3.12)
Mail command failed: 530-5.7.0 Authentication Required. For more information, go to 530 5.7.0 https://support.google.com/accounts/troubleshooter/2402620. 8926c6da1cb9f-5aea73dbf4asm550045173.5 - gsmtp
build (3.12)
Process completed with exit code 2.
build (3.10)
The strategy configuration was canceled because "build._3_12" failed
build (3.10)
Mail command failed: 530-5.7.0 Authentication Required. For more information, go to 530 5.7.0 https://support.google.com/accounts/troubleshooter/2402620. 98e67ed59e1d1-33fed7e9571sm1244068a91.9 - gsmtp
build (3.10)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_12" failed
build (3.11)
Mail command failed: 530-5.7.0 Authentication Required. For more information, go to 530 5.7.0 https://support.google.com/accounts/troubleshooter/2402620. d9443c01a7336-29498d097fasm13060125ad.29 - gsmtp
build (3.11)
The operation was canceled.